One of the recent challenges was the urgent construction of access to the broken 400kV power line pole on the Rzeszów-Skawina-Tarnów route. Within two days of receiving the assignment, we initiated the installation of an access road spanning nearly a kilometer, complete with a work platform. The access road traversed a hillside with a consistent local gradient of up to 20%. Depending on the slope, we utilized Metrum5, Strong, and Aluminum plates. Ultimately, we delivered and installed 4,500 square meters of road plates, allowing all the necessary equipment, including a 350-ton crane (without ballast), to safely and independently access the site for repairing the outage. We extend our gratitude to the entire Eltel Networks team for their trust and successful collaboration.

<
>