Tymczasowe Drogi Modułowe
niwelacja terenu

Ground levelling

In the new year, we continue to present unusual applications of our elements. Seemingly, the implementation shown in the photos looks ordinary, but as usual „the devil is in the details” 😉 We were faced with the task of leveling the local lowering of commune road in the Gostynin area to enable the safe passage of oversized transports with elements of wind farms. We delivered and installed Metrum panels, also popularly known as bagermats, in two layers arranged bidirectionally. The plates were placed just before and dismantled immediately after the delivery of the elements. Thanks to this treatment, we raised the grade line of the road by 20 cm on a section of about 120 m, and deliveries were made as planned 💪

<
>