Temporary roads and maneuvering areas were constructed with Metrum plates at the photovoltaic farm in Tyniec Legnicki.

Temporary Roads and Areas for the Construction of a Solar Farm in Tyniec Legnicki

During the construction of the solar farm in Tyniec Legnicki, it was crucial to provide infrastructure that would enable the efficient transport and installation of solar panels and the construction of a transformer station. To stabilize the ground and ensure safety for heavy equipment, Metrum wooden road plates were used. These facilitated the creation of temporary roads and maneuvering areas, allowing for a smooth investment process.

Logistical Challenges in Building the Solar Farm

The construction of the solar farm and transformer station required thorough site preparation. Key organizational aspects included:

  • Creating stable access roads – enabling the transport of heavy components such as support structures, PV modules, and power station elements.
  • Providing maneuvering spaces – allowing for the safe storage of panels and handling of transport.
  • Protecting the ground from damage – minimizing ground disturbance by using temporary road plates.

Metrum Plates – Ground Stabilization and Protection

Metrum plates were used for building roads and areas, which proved ideal for this project. Their key advantages include:

  • High load capacity – allowing safe movement of heavy construction vehicles.
  • Excellent ground adaptation – wood provides flexibility and better stabilization than rigid concrete plates.
  • Quick assembly and disassembly – crucial for the dynamic stages of construction.
  • Eco-friendly solution – wooden plates are a natural material that does not interfere with the environment and can be reused multiple times.

This allowed for the safe storage of solar farm components, the transport of equipment to the transformer station, and provided a stable base for construction equipment.

Outcomes and Project Execution

On the site of the solar farm in Tyniec Legnicki, we established temporary roads and maneuvering areas, which enabled:

  • Safe storage of PV installation elements before installation.
  • Ground stabilization, eliminating the risk of surface subsidence.
  • Efficient transport of equipment to the transformer station and optimization of the construction schedule.

After the project was completed, the plates were removed, and the area was restored to its original state.

Project Video

(An embedded video showcasing the project execution can be placed here if available.)

Road Plate Rental – Check Our Offer

The solar farm in Tyniec Legnicki is another example where rental road plates played a crucial role in ground stabilization. If you are planning a construction project that requires temporary roads and storage areas, contact us and choose the best solution for your investment!

Contact us

Other projects

Rock For People 2025

Kolejny sezon Rock for People za nami. Tym razem 5-dniowy, jeden z największych festiwali w Europie obchodził 30-lecie istnienia. Wystąpiło ponad 200 artystów, m.in. Linkin Park, Slipknot, Guns N’ Roses,

Read More »
Tymczasowe Drogi Modułowe - Przewiert sterowany Dolna Odra

Directional Drilling Dolna Odra

The construction of the DN700 gas pipeline Przywodzie – Lower Odra required temporary roads and assembly platforms. Check how road plates for rent ensured efficient equipment transport and ground protection!

Read More »
Droga dojazdowa do masztu telekomunikacyjnego

Telecommunication Mast Trepcza

The construction of a telecommunication mast in Trepcza required a technological road for heavy equipment. With rented Alu Deck HD and Metrum plates, the delivery was safe and on schedule.

Read More »