Temporary Access Roads and Storage Yards at the Wisznice Wind Farm

Farma Wiatrowa Wisznice
On the site of the Wisznice Wind Farm, temporary roads and maneuvering yards were constructed using Strong plates and Metrum plates.

Temporary Platforms and Roads for Wind Turbine Transport – Wisznice Wind Farm

During the construction of the Wisznice Wind Farm, creating stable temporary roads and maneuvering areas was key to ensuring the safe transport and storage of wind turbine components. The large size and weight of the components required a properly prepared ground that would provide high load-bearing capacity and durability. To achieve this, Strong wooden road plates and Metrum wooden plates were used, tailoring solutions to the specific needs of the project.

Logistical Challenges in Wind Farm Construction

Wind turbines are structures with multi-ton components that must be not only precisely transported but also properly stored before assembly. At FW Wisznice, the key logistical aspects included:

  • Ground Protection – protecting against sinking under heavy vehicles and assembly equipment.
  • Efficient Transport of Turbine Components – the necessity to build access roads with high load-bearing capacity.
  • Organization of Maneuvering Areas – creating areas that allow for the storage of blades and towers prior to assembly.

Strong and Metrum Plates – Effective Solutions for FW Wisznice Construction

To meet the requirements of this project, Strong plates were used, which proved ideal as temporary roads and storage areas. Their key advantages include:

  • Resistance to Heavy Loads – essential for transporting heavy components.
  • Flexibility of Use – effectively stabilizing both access roads and maneuvering surfaces.
  • Ease of Installation and Removal – allowing for quick adaptation of the terrain to the changing needs of construction.

Additionally, in some areas, Metrum plates were used, providing ground stabilization and proving effective in areas requiring lighter yet equally durable solutions.

Effects and Progress of the Project

At the FW Wisznice site, we established temporary roads and maneuvering areas, which enabled:

  • Safe storage of wind turbine elements before assembly.
  • Ground stabilization, eliminating the risk of surface sinking.
  • Efficient organization of transport and optimization of the construction schedule.

Upon completion of the project, the plates were removed, and the area was restored to its original state.

Road Plate Rental – Check Our Offer

The Wisznice Wind Farm is another example where road plates for rent played a crucial role in ground stabilization. If you are planning a construction that requires temporary roads and storage areas, contact us and choose the best solution for your investment! Contact us.

Contact us

Other projects

Droga dojazdowa do masztu telekomunikacyjnego

Telecommunication Mast Trepcza

The construction of a telecommunication mast in Trepcza required a technological road for heavy equipment. With rented Alu Deck HD and Metrum plates, the delivery was safe and on schedule.

Read More »
Masz telekomunikacyjny Ociesęki

Telecommunication Mast Ociesęki

The installation of a telecommunications mast in Ociesęki required an access road on a steep slope. Thanks to Alu Deck HD plates, the crane entered without any problems, and the work was completed in one day.

Read More »
Farma fotowoltaiczna Miłakowo

Miłakowo Solar Farm

Miłakowo Photovoltaic Farm – transport and installation of transformer stations using Metrum plates. Find out how we provided a stable foundation for heavy equipment.

Read More »
×

Lait Content Creator