Directional Drilling Dolna Odra

Tymczasowe Drogi Modułowe - Przewiert sterowany Dolna Odra
The construction of the DN700 gas pipeline Przywodzie – Lower Odra required temporary roads and assembly platforms. Check how road plates for rent ensured efficient equipment transport and ground protection!

Temporary Access Roads for the DN700 Przywodzie – Dolna Odra Gas Pipeline Construction

The construction of strategic transmission networks, such as the DN700 Przywodzie – Dolna Odra gas pipeline, requires precise planning and appropriate preparation of auxiliary infrastructure. A key element of this project was the creation of temporary roads, enabling safe transport of heavy equipment and the execution of numerous directional drills.

Over more than 60 kilometers of the project since April of last year, we have been implementing access roads and assembly yards, which allowed for efficient execution of works in areas of collision-free crossings, such as local roads, waterways, and the S3 expressway.

Thanks to the use of rental road plates, it was possible to adapt the temporary infrastructure effectively and flexibly to changing terrain conditions.

Logistical Challenges in the Construction of the DN700 Gas Pipeline

The implementation of such a large-scale project involved numerous challenges that required the use of proven road infrastructure solutions. The greatest challenges included:

  • Ensuring safe access to directional drilling sites – many sections traversed difficult-to-access areas, including wetlands and forests.
  • Protecting surfaces in environmentally sensitive areas – the need to secure land around waterways.
  • Assembly and disassembly of temporary infrastructure – during peak work periods, we simultaneously utilized over 11,000 m² of temporary surfaces.
  • Ground stabilization for heavy machinery – cranes, drills, and transport vehicles required a solid foundation resistant to heavy loads.

Thanks to rental road plates, it was possible to manage the infrastructure flexibly, allowing for optimal adaptation of temporary roads to the changing conditions of the project.

Wooden Road Plates Metrum – stabilization in wetland areas

For the construction of temporary roads in more challenging ground conditions, wooden road plates Metrum were used, which are excellent for wetland areas and forested environments.

Key Advantages of Metrum Plates in This Project:

  • Excellent stabilization on soft ground – enabling safe transport of heavy vehicles.
  • Lightweight construction and quick assembly – allowing flexible adaptation of temporary infrastructure.
  • Eco-friendly solution – wood is a natural material that can be easily removed after completion of work.

Thanks to Metrum plates, the negative environmental impact was minimized, while ensuring a durable surface at critical points of the project.

Check out our other road plates and choose the best solution tailored to your project.

Implementation Results – Benefits of Using Road Plates

The use of temporary roads and assembly platforms for the DN700 gas pipeline construction allowed for:

  • Safe transport of construction equipment and materials – efficient delivery of drills, pipes, and heavy equipment.
  • Protection of environmentally sensitive areas – eliminating the risk of soil and waterway degradation.
  • Faster project execution – quick assembly and disassembly of plates allowed for dynamic work progress.
  • Cost reduction associated with temporary road construction – renting road plates proved more efficient than building permanent infrastructure.

Collaboration with PORR S.A. proceeded according to schedule, and the project was completed on time thanks to the applied infrastructure solutions.

Why Rent Road Plates for Infrastructure Projects?

The construction of pipelines, directional drills, and other projects requiring temporary road infrastructure demands flexible and effective solutions. Renting road plates allows for:

  • Adjusting the type of surface to ground conditions – the ability to use different types of plates depending on the substrate.
  • Optimizing construction costs – no need to build permanent access roads.
  • Quick assembly and disassembly – saving time and minimizing interference with the investment area.
  • Safe transport and maneuvering of heavy equipment – stable ground even in difficult conditions.

If your project requires stable temporary roads, access to the construction site, or protection of the ground from damage, contact us and choose the best solution tailored to your needs.

Contact us

Other projects

Energetab 2023 - Międzynarodowe Targi Energetyczne

Energetab 2023

The ENERGETAB 2023 fair is a key event for the energy industry. Check out the solutions for temporary infrastructure and event flooring that we showcased at our booth.

Read More »
Farma fotowoltaiczna Przykona

Photovoltaic Farm Przykona

Reinforcement of the entrance for transformer delivery at the construction of a photovoltaic farm in the town of Przykona. Alu Deck HD aluminum plates provided stability and safety.

Read More »
×

Lait Content Creator