Work Platform of the Pontoon in the Port of Gdynia

Pokład roboczy barki - płyty drewniane Metrum 5

Share

Metrum plates as a working deck on a barge in the port of Gdynia. Stable surface for machines weighing 200 tons. Check out this unique application!

Metrum Plates on a Barge – Unusual Application in Gdynia Port

We conclude the series of unusual applications of road plates with an exceptional project. This time, Metrum wooden road plates were used as a working deck on a barge utilized in the reconstruction of the Indian Quay at Gdynia Port. Aarsleff, a company specializing in hydrotechnical works, used them as a stable surface for construction machinery with a total weight of almost 200 tons.

Challenges of Working on Water

Reconstructing port infrastructure requires specialized solutions, especially when work is conducted on water. In this case, it was crucial to ensure:

  • Durable surface – the machines working on the barge generate enormous loads that require a stable base.
  • Moisture and weather resistance – the deck material had to withstand harsh environmental conditions.
  • Easy assembly and disassembly – the plates had to be quickly installed and removed after the work was completed.

Metrum Plates as a Working Deck on a Barge

The use of Metrum plates in this project proved to be an excellent solution because:

  • They ensured even load distribution, protecting the barge structure.
  • They perform well in high-humidity environments, which was crucial in port conditions.
  • They are lightweight and easy to install, allowing for quick preparation of the working platform.

Thanks to these properties, construction machines could safely move on the deck, and the work proceeded according to schedule.

Video from the Project

(An embedded video can be placed here if available.)

Check Our Road Plate Rental Offer

Road plates are used not only as temporary roads but also as working decks and stabilizing surfaces. If you are looking for reliable solutions, check out the full offer of road plates or contact us to find the best solution!


P.S. Photo taken on Valentine’s Day: HE Junttan, SHE ABI, and as usual, SHE is in the spotlight, and HE is in her shadow.

Contact us

Other projects

Kielce - przewiert sterowany

Kielce, directional drilling

The construction of a directional drilling in Kielce required a stable access road in a muddy forest area. Thanks to Metrum plates, equipment and vehicles could safely reach the investment site.

Read More »

Access Road to Construction of the Hall

Budowa hali z żelbetowych elementów prefabrykowanych. Wybór naszych powierzchni pozwolił wykonawcy przygotować na gotowo podbudowę pod wykonanie posadzki. Rozpoczęto montaż słupów, ale powierzchnie tymczasowe przygotowane sa do poruszania się dźwigu

Read More »
×

Lait Content Creator