Gas Pipeline Wola Osowińska

Gazociąg Wola Osowińska

Share

At the construction site of the gas pipeline in Wola Osowińska, Metrum plates were used for building temporary roads and maneuvering areas.

Access Roads and Maneuvering Areas at the Gas Pipeline Construction Site in Wola Osowińska

During the construction of the gas pipeline in Wola Osowińska, ensuring stable infrastructure was crucial for the access of heavy equipment to the construction site. Due to the challenging terrain, which included wetlands and a river, Metrum wooden road plates were used to construct temporary roads, maneuvering areas, and a temporary bridge.

Terrain Challenges in Gas Pipeline Construction

The construction of the gas pipeline required overcoming many terrain obstacles, including:

  • River crossings – the necessity to build a temporary bridge that allowed the passage of construction equipment.
  • Wet and unstable soils – stabilizing the terrain to prevent vehicles from sinking.
  • Access for heavy equipment – ensuring adequate load-bearing capacity for cranes, excavators, and transport vehicles.

Metrum Plates – Key to Terrain Stability

To meet these challenges, Metrum plates were used, which proved highly effective in the conditions of gas pipeline construction. Their key advantages include:

  • High load capacity – allowing the passage of cranes, excavators, and heavy vehicles.
  • Quick assembly and disassembly – adapting the infrastructure to the dynamic needs of construction.
  • Safe ground stabilization – eliminating the risk of vehicles sinking on wet terrain.
  • Reusability – an ecological and economical solution for demanding constructions.

Temporary Bridge Over the River

Due to the gas pipeline crossing a river, it was necessary to create a temporary bridge that allowed for the safe passage of heavy equipment, ensuring:

  • Stable ground – enabling the safe passage of cranes and excavators.
  • Resistance to changing weather conditions – wood performs well in a humid environment.
  • Quick disassembly – after the completion of work, the bridge was dismantled, and the area was restored to its original state.

Project Outcomes

Thanks to the use of appropriate technologies, it was possible to:

  • Build access roads and maneuvering areas necessary for efficient work execution.
  • Allow the entry of heavy equipment, including cranes and excavators, to the construction site.
  • Overcome water obstacles by constructing a temporary bridge that facilitated material transport.

Road Plate Rental – Check Our Offer

If you’re looking for proven solutions for building temporary roads, maneuvering areas, or temporary bridges, check out our road plate rental. We offer Metrum plates and others that perform well in challenging terrain conditions. Contact us to select the best solution for your investment!

Contact us

Other projects

Turniej tenisa WTA 250 BNP Paribas Warszawa

WTA 250 BNP Paribas Warsaw Open

The WTA 250 BNP Paribas Warsaw Open is a prestigious event where Heavy Deck Panels were used. They ensured surface protection, player comfort, and a modern look for the tournament area. Check out how our event solutions support the organization of world-class sports events!

Read More »
Kielce - przewiert sterowany

Kielce, directional drilling

The construction of a directional drilling in Kielce required a stable access road in a muddy forest area. Thanks to Metrum plates, equipment and vehicles could safely reach the investment site.

Read More »

Access Road to Construction of the Hall

Budowa hali z żelbetowych elementów prefabrykowanych. Wybór naszych powierzchni pozwolił wykonawcy przygotować na gotowo podbudowę pod wykonanie posadzki. Rozpoczęto montaż słupów, ale powierzchnie tymczasowe przygotowane sa do poruszania się dźwigu

Read More »
×

Lait Content Creator