Tarczyński Arena Wrocław

Alu Deck i Alu Deck HD - Tarczyński Arena Wrocław
We secured 9500 m² of the stadium surface in Wrocław, preparing it for Dawid Podsiadło's concert. Check out how Alu Deck panels ensured safety and stability.

Ready for big events? We are! – a record delivery and installation of aluminum panels at Tarczyński Arena Stadium

We are pleased to announce that as a Polish company with fully Polish capital, for the first time in our country’s history, we have delivered and installed nearly 9500 m² of aluminum panels securing the stadium surface. This is a remarkable achievement because all panels were entirely made in Poland and based on our own material!

This time, our task was securing the entire stadium field of Tarczyński Arena in Wrocław. By creating a stable and safe surface, we enabled the construction of the stage and organization of Dawid Podsiadło’s concert, which will take place in June 2024.

Innovative approach to aluminum panel construction

To better adapt our offer to the requirements of major event organizers, we decided to introduce a new generation of panels. Some of our panels have been designed to be lighter and more mobile, while maintaining their full durability. This ensures maximum safety while being even easier to transport and install.

In addition to Alu Deck and Alu Deck HD panels, which played a key role in this project, we also have a full range of Heavy Deck and Flex Deck panels, which complement our offer and allow for the securing of any surfaces – from stadiums to outdoor events on challenging terrain.

Aluminum Plates Alu Deck

A key element in securing the stadium field was the Alu Deck panels, which, due to their lightness and high durability, provided a stable surface enabling efficient stage and concert infrastructure installation.

Key features of Alu Deck panels:

  • resistance to large dynamic loads, allowing for the safe placement of heavy structures,
  • low weight while maintaining high load capacity, which facilitates transport and quick installation,
  • non-slip surface, ensuring safety for technicians and assembly teams,
  • weather resistance, which is crucial for organizing outdoor mass events.

Check out our other road plates and choose the best solution tailored to your investment.

Project outcomes – what was achieved?

Thanks to efficient organization and the use of our aluminum panels, we achieved:

  • securing the entire stadium field in record time,
  • creating a stable foundation for stage and concert infrastructure,
  • guaranteeing maximum safety for technical teams,
  • ensuring quick installation and dismantling, which allows for efficient reconfiguration of the venue,
  • introducing a new, even more mobile version of panels, which will be perfect for future events.

Thanks to our experienced and indispensable employees and our own technical facilities, we are able to carry out full security within two work shifts!

Summary – ready for the next challenges!

This project is another proof that we can secure the largest mass events in Poland and Europe. We are proud to have delivered fully Polish aluminum panels, which provided maximum safety and stability at Tarczyński Arena Stadium.

Thank you to everyone involved in this project! And to all those who managed to get tickets for Dawid Podsiadło’s concert, I wish unforgettable experiences!

If your investment requires rental of road plates and aluminum panels, contact us. We offer Alu Deck, Alu Deck HD, Heavy Deck, and Flex Deck, tailored to various operational conditions. Feel free to contact us.

Contact us

Other projects

Gdynia Sailing Days

Ahoj! Meldujemy się z naszymi zabezpieczeniami powierzchni dla Polski Związek Żeglarski który we współpracy z Gdyńskie Centrum Sportu, w lipcu będzie organizatorem 26 edycji międzynarodowego festiwalu żeglarskiego Gdynia Sailing Days,

Read More »
Droga dojazdowa do farmy fotowoltaicznej

Access Road in the Lubusz Voivodeship

The construction of a photovoltaic farm in the Lubusz Voivodeship required an access road for transformer transport. Thanks to the rented wooden Metrum plates, the delivery was smooth and safe. Check out the solutions that were applied!

Read More »
Gazociąg Łapy - zastosowanie płyt drewnianych STRONG

Gas Pipeline Łapy

Check how Metrum and Strong road plates provided stability for the access road and work platform during directional drilling under railway line no. 75 in Łapy.

Read More »
Pokład łodzi na Mierzei Wiślanej

Vistula Spit

Metrum plates were used to prepare the deck of a workboat during the construction of the shipping canal on the Vistula Spit.

Read More »
×

Lait Content Creator