Construction of the hall with prefabricated reinforced concrete elements. Choosing our surfaces allowed the contractor to prepare the substructure ready for the floor implementation. The installation of columns has begun, but the temporary surfaces are prepared for the movement of a 350-ton class wheeled crane and the installation of the heaviest ones, which are prestressed girders weighing 40 tons each. Thank you for your trust!

Technological Access for the Dismantling of the 400kV Power Line Mikułowa – Świebodzice
How to safely establish technological access for dismantling a 400kV line in difficult terrain in 10 days? Check out the case from Mikulowa – Swiebodzice based on Metrum plates.