The Longest Bore in Poland – Platform

Stacja podnoszenia ciśnienia w Policach DN500

Share

Pressure Boosting Station in Police DN500

Contact us

Other projects

Farma fotowoltaiczna Przykona

Photovoltaic Farm Przykona

Reinforcement of the entrance for transformer delivery at the construction of a photovoltaic farm in the town of Przykona. Alu Deck HD aluminum plates provided stability and safety.

Read More »
Farma fotowoltaiczna Miłakowo

Miłakowo Solar Farm

Miłakowo Photovoltaic Farm – transport and installation of transformer stations using Metrum plates. Find out how we provided a stable foundation for heavy equipment.

Read More »