The Longest Bore in Poland – Platform

Stacja podnoszenia ciśnienia w Policach DN500

Share

Pressure Boosting Station in Police DN500

Contact us

Other projects

Linia 400kV Kozienice-Miłosna

400 kV line Kozienice-Miłosna

The construction of the 400 kV Kozienice-Miłosna line required 60 km of temporary roads and platforms for heavy equipment. Thanks to Metrum and Strong plates, transportation and assembly went smoothly. Check out the solutions that were applied!

Read More »