The Longest Bore in Poland – Platform

Stacja podnoszenia ciśnienia w Policach DN500

Share

Pressure Boosting Station in Police DN500

Contact us

Other projects

Droga dojazdowa do masztu telekomunikacyjnego

Telecommunication Mast Trepcza

The construction of a telecommunication mast in Trepcza required a technological road for heavy equipment. With rented Alu Deck HD and Metrum plates, the delivery was safe and on schedule.

Read More »
Pokład łodzi na Mierzei Wiślanej

Vistula Spit

Metrum plates were used to prepare the deck of a workboat during the construction of the shipping canal on the Vistula Spit.

Read More »
×

Lait Content Creator