Removing Storm Effects in Greater Poland

Share

As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Contact us

Other projects

Farma fotowoltaiczna Przykona

Photovoltaic Farm Przykona

Reinforcement of the entrance for transformer delivery at the construction of a photovoltaic farm in the town of Przykona. Alu Deck HD aluminum plates provided stability and safety.

Read More »

Gas Pipeline Kolnik – Gdańsk

Są tu tacy, którzy pamiętają dawne czasy i wiedzą, że kiedyś drogi przy budowie gazociągów robione były z faszyny i zapewne tacy, którzy nie wiedzą czym jest faszyna . Współczesny

Read More »
Kielce - przewiert sterowany

Kielce, directional drilling

The construction of a directional drilling in Kielce required a stable access road in a muddy forest area. Thanks to Metrum plates, equipment and vehicles could safely reach the investment site.

Read More »