As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Photovoltaic Farm Przykona
Reinforcement of the entrance for transformer delivery at the construction of a photovoltaic farm in the town of Przykona. Alu Deck HD aluminum plates provided stability and safety.