Removing Storm Effects in Greater Poland

As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Contact us

Other projects

Farma fotowoltaiczna Bielice

Bielice Solar Farm

The construction of the photovoltaic farm in Bielice required a stable temporary road in the muddy terrain. Thanks to the road plates, the transport of equipment and installation of the transformer station went smoothly. Check out the solutions used!

Read More »
eRobocze Show Lubień Kujawski 2023

eRobocze Show Lubień Kujawski

During the eRobocza SHOW 2024 in Lubień Kujawski, we used steel, wooden, and aluminum plates to secure the area. Thanks to these, participants and machines could move safely across the 50,000 m² surface. Check out the solutions we implemented!

Read More »
Tymczasowa droga dojazdowa - Korytnica

What to Use for a Temporary Access Road?

Stojąc przed wyzwaniem wybudowania drogi dojazdowej, inwestorzy muszą zastanowić się nad tym, jakie rozwiązanie sprosta ich oczekiwaniom. Planując realizację inwestycji budowlanej, należy zorganizować tymczasowy dojazd, który zapewni swobodny dostęp do

Read More »
×

Lait Content Creator