Removing Storm Effects in Greater Poland

Share

As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Contact us

Other projects

Energetab 2023 - Międzynarodowe Targi Energetyczne

Energetab 2023

The ENERGETAB 2023 fair is a key event for the energy industry. Check out the solutions for temporary infrastructure and event flooring that we showcased at our booth.

Read More »
Droga dojazdowa do masztu telekomunikacyjnego

Telecommunication Mast Trepcza

The construction of a telecommunication mast in Trepcza required a technological road for heavy equipment. With rented Alu Deck HD and Metrum plates, the delivery was safe and on schedule.

Read More »