Assembly of the production line at the factory in Siechnice

Transport elementów fabryki w Siennice - Płyty drewniane Metrum 5

Share

Transport of production line and magnetic resonance scanner – road plates for rent, temporary roads, stable surfaces.

Assembly of the production line at the factory in Siechnice – the use of temporary roads

The assembly of the production line at the active substances factory in Siechnice required specialized solutions to enable the efficient transport of heavy and precise technological components. To ensure surface stability and the possibility of safely maneuvering transport equipment, we used temporary roads based on Metrum wooden road plates. This made it possible to successfully transport and assemble modern equipment in challenging terrain conditions.

Challenges related to the transport and assembly of the production line

The transport and assembly of production line components to the factory required precise planning and adaptation of temporary infrastructure. The key challenges included:

  • Transport of heavy components – the need to ensure a stable surface for delivery vehicles.

  • Safety of equipment and operators – minimizing the risk of damage to transported devices and eliminating hazards for workers.

  • Infrastructure adaptation – the ability to quickly assemble and disassemble temporary surfaces without interfering with the factory grounds.

To meet these requirements, road plates for rent were used, which allowed for the creation of temporary transport platforms and maneuvering yards.

Metrum wooden road plates – the ideal solution for temporary transport roads

During the project, we used Metrum wooden road plates, which are perfectly suited for the transport of heavy equipment in demanding conditions. The key advantages of this solution are:

  • High durability – providing a stable surface for heavy transport vehicles and cranes.

  • Quick assembly and disassembly – ease of laying and removal after project completion.

  • Excellent terrain stabilization – eliminating the risk of surface sinking on uneven ground.

  • Eco-friendly solution – reusability and minimal environmental impact.

Thanks to the use of these plates, the transport of production line components proceeded smoothly and safely, leaving the factory grounds undisturbed.

Transport of the MRI scanner to St. Elizabeth’s Hospital

Another challenge within this project was the delivery of an MRI scanner to St. Elizabeth’s Hospital in Mazovia. Transporting such advanced and sensitive equipment required an ideally stable surface for its movement and installation.

The use of Metrum road plates enabled the creation of a temporary surface that ensured the safe conduct of the transport, eliminating the risk of equipment damage. As a result, the scanner was delivered and installed in the designated location without any complications.

Summary – effective use of temporary roads

Within this project we executed:

  • Temporary transport platforms for the production line in the factory in Siechnice.

  • Access roads and maneuvering areas for heavy transport equipment.

  • A surface enabling the safe transport of the MRI scanner to the hospital.

Thanks to the use of Metrum plates, it was possible to quickly and efficiently carry out all logistical operations.

Benefit from road plates rental

If you are planning the transport of heavy equipment and need temporary roads, we offer road plates for rent that will ensure stability and safety of transport even in demanding conditions. Contact us, and we will help you choose the best solution for your project!

Contact us

Other projects

Master Truck Show

Master Truck Show

Nasze drogi tymczasowe na Master Truck Show 2024 Master Truck Show to jedno z najważniejszych wydarzeń motoryzacyjnych w Polsce, przyciągające tysiące fanów ciężarówek, tuningowanych pojazdów i maszyn specjalistycznych. Każda edycja

Read More »

Access Road to Construction of the Hall

Budowa hali z żelbetowych elementów prefabrykowanych. Wybór naszych powierzchni pozwolił wykonawcy przygotować na gotowo podbudowę pod wykonanie posadzki. Rozpoczęto montaż słupów, ale powierzchnie tymczasowe przygotowane sa do poruszania się dźwigu

Read More »

Gdynia Sailing Days

Ahoj! Meldujemy się z naszymi zabezpieczeniami powierzchni dla Polski Związek Żeglarski który we współpracy z Gdyńskie Centrum Sportu, w lipcu będzie organizatorem 26 edycji międzynarodowego festiwalu żeglarskiego Gdynia Sailing Days,

Read More »
Tymczasowe Drogi Modułowe - Przewiert sterowany Dolna Odra

Directional Drilling Dolna Odra

The construction of the DN700 gas pipeline Przywodzie – Lower Odra required temporary roads and assembly platforms. Check how road plates for rent ensured efficient equipment transport and ground protection!

Read More »