Miłakowo Photovoltaic Farm – Comprehensive Project Using Metrum Plates
Temporary roads, access routes, and maneuvering areas are our specialty, but this time we faced a much bigger challenge. A client from the Czech Republic entrusted us with the comprehensive execution of a task involving the transport and installation of transformer stations for the photovoltaic farm in Miłakowo.
To ensure a stable and durable foundation, we used Metrum plates, which allowed for efficient transport and installation of transformer stations without the risk of ground damage.
The scope of work included:
- receiving transformer stations from the manufacturer and specialized transport,
- preparatory works, including earthworks and demolition,
- unloading and reloading on site,
- supply and installation of temporary surfaces with Metrum plates,
- organization and securing of traffic,
- bringing in and setting up transformer stations,
- dismantling of surfaces and restoration of the area to its original state.
Thank you for your trust!
Wooden Road Plates Metrum
In this project, we used Metrum plates, which are ideal as temporary surfaces for heavy equipment. Thanks to their durability and quick assembly, they allow for terrain stabilization in difficult conditions.
Key advantages of Metrum plates:
- high load capacity, allowing for heavy equipment operation,
- flexibility of use on various surfaces,
- quick assembly and disassembly,
- protection of the area from damage.
Check our other road plates and find the best solution tailored to your investment.
Summary – Comprehensive Solutions Using Metrum Plates
Thanks to the use of Metrum plates, we were able to provide a stable and safe foundation for the transport and installation of transformer stations, minimizing interference with the terrain.
If your investment requires the rental of road plates, contact us. We offer Metrum plates and other solutions adapted to difficult terrain conditions. Feel free to contact us.