Removing Storm Effects in Greater Poland

As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Contact us

Other projects

Farma fotowoltaiczna Bielice

Bielice Solar Farm

The construction of the photovoltaic farm in Bielice required a stable temporary road in the muddy terrain. Thanks to the road plates, the transport of equipment and installation of the transformer station went smoothly. Check out the solutions used!

Read More »
Masz telekomunikacyjny Ociesęki

Telecommunication Mast Ociesęki

The installation of a telecommunications mast in Ociesęki required an access road on a steep slope. Thanks to Alu Deck HD plates, the crane entered without any problems, and the work was completed in one day.

Read More »
Droga dojazdowa do farmy fotowoltaicznej

Access Road in the Lubusz Voivodeship

The construction of a photovoltaic farm in the Lubusz Voivodeship required an access road for transformer transport. Thanks to the rented wooden Metrum plates, the delivery was smooth and safe. Check out the solutions that were applied!

Read More »
×

Lait Content Creator