As a result of a violent storm that swept through Greater Poland, high-voltage poles were damaged in the Poznań area. Within 24 hours of the report, we were on-site and began installing nearly 1,800m2 of temporary surfaces as access roads to the damaged positions of the 220kV line Polkowice-Leszno-Plewiska. Based on our own resources, experienced teams, transport vehicles, and materials located in several warehouses in Poland, we are able to respond swiftly to the needs of our Clients. Thank you for your trust!

Bielice Solar Farm
The construction of the photovoltaic farm in Bielice required a stable temporary road in the muddy terrain. Thanks to the road plates, the transport of equipment and installation of the transformer station went smoothly. Check out the solutions used!