Kotomierz Wind Farm

Farma wiatrowa Krotomierz
In Kotomierz, we created temporary platforms for transporting wind turbines using Strong plates.

Temporary Sites for Transporting Wind Turbine Components – Kotomierz Wind Farm

During the construction of wind farms, it is crucial to ensure stable and safe surfaces for the transport and storage of turbine components. In the project carried out in Kotomierz, we used Strong wooden road plates, which served as temporary maneuvering areas and temporary roads, enabling the efficient movement of heavy equipment.

Challenges Related to Wind Turbine Transport

Wind turbines consist of huge and heavy components, such as blades, towers, and generators, which require precise transport and safe storage before assembly. The main challenges included:

  • Ensuring ground bearing capacity – the need to stabilize the ground under heavy transports and cranes.
  • Securing the storage area – eliminating the risk of surface subsidence and protecting components.
  • Efficient assembly and disassembly of temporary roads – adapting infrastructure to a dynamically changing construction schedule.

Strong Plates – Ideal Solution for Demanding Conditions

For this project, we used Strong wooden road plates, which are distinguished by:

  • High durability – resistance to very heavy loads, which was crucial for transporting turbines.
  • Flexibility of use – they are suitable both as a transport surface and a maneuvering area.
  • Ease of assembly and disassembly – this enabled quick adaptation of the construction site to the needs of the investment.

Thanks to the use of Strong plates, it was possible to create a stable surface that allowed for the safe transport and storage of wind turbine components.

Effects and Course of Implementation

In Kotomierz, we built temporary maneuvering areas and access roads, which enabled:

  • Safe storage and transport of turbine components before assembly.
  • Terrain stabilization, which helped avoid problems with ground subsidence.
  • Efficient conduct of construction works and adapting infrastructure to the changing needs of the project.

After the construction was completed, the plates were easily removed, and the area was restored to its original state.

Road Plate Rental – Check Our Offer

Temporary maneuvering areas and access roads are a key element in the construction of wind farms. Check out our road plate rental offer tailored to demanding terrain conditions or contact us to choose the best solution for your investment.

Contact us

Other projects

Droga dojazdowa do farmy fotowoltaicznej

Access Road in the Lubusz Voivodeship

The construction of a photovoltaic farm in the Lubusz Voivodeship required an access road for transformer transport. Thanks to the rented wooden Metrum plates, the delivery was smooth and safe. Check out the solutions that were applied!

Read More »
Farma fotowoltaiczna Szymanowice

Photovoltaic Farm in Szymanowice

The construction of the photovoltaic farm in Szymanowice required stable temporary roads and maneuvering yards. Rented road plates provided safe transport and efficient project execution. Check out the solutions that were implemented!

Read More »
Tymczasowa droga dojazdowa - Korytnica

What to Use for a Temporary Access Road?

Stojąc przed wyzwaniem wybudowania drogi dojazdowej, inwestorzy muszą zastanowić się nad tym, jakie rozwiązanie sprosta ich oczekiwaniom. Planując realizację inwestycji budowlanej, należy zorganizować tymczasowy dojazd, który zapewni swobodny dostęp do

Read More »
Droga dojazdowa do masztu telekomunikacyjnego

Telecommunication Mast Trepcza

The construction of a telecommunication mast in Trepcza required a technological road for heavy equipment. With rented Alu Deck HD and Metrum plates, the delivery was safe and on schedule.

Read More »
×

Lait Content Creator