Construction of the hall with prefabricated reinforced concrete elements. Choosing our surfaces allowed the contractor to prepare the substructure ready for the floor implementation. The installation of columns has begun, but the temporary surfaces are prepared for the movement of a 350-ton class wheeled crane and the installation of the heaviest ones, which are prestressed girders weighing 40 tons each. Thank you for your trust!

Access Road to the Construction Site of a Photovoltaic Farm
Wiemy, że kojarzycie nas z błotem po pas i najczęściej widzicie nas w terenie zaraz po dżdżu lub ulewnych deszczach. A co jeżeli powiemy Wam, że to nie jedyne zagrożenie,