Construction of the hall with prefabricated reinforced concrete elements. Choosing our surfaces allowed the contractor to prepare the substructure ready for the floor implementation. The installation of columns has begun, but the temporary surfaces are prepared for the movement of a 350-ton class wheeled crane and the installation of the heaviest ones, which are prestressed girders weighing 40 tons each. Thank you for your trust!

Kotomierz Wind Farm
In Kotomierz, we created temporary platforms for transporting wind turbines using Strong plates.