Vistula Spit

Pokład łodzi na Mierzei Wiślanej
Metrum plates were used to prepare the deck of a workboat during the construction of the shipping canal on the Vistula Spit.

Workboat Deck on the Vistula Spit Shipping Canal Construction

Hydrotechnical Works on the Vistula Spit – Stable Surface for Equipment

During the construction of the shipping canal on the Vistula Spit, it was necessary to ensure a stable surface for equipment working on the water, including pile drivers. One of the key elements was the preparation of the workboat deck, which had to meet high load-bearing and resistance requirements for harsh marine conditions.

Wooden road plates from Metrum were used to create this surface, which are excellent for temporary working surfaces, even on floating units.

Renting Road Plates – Proven Solutions for Hydrotechnics

Wooden road plates are a versatile solution used in various industries – from construction to hydrotechnical works. If you are looking for a stable surface on water or land, check out road plate rental and tailor the solution to your needs.

Whether you are building temporary roads, working sites, or need a durable surface on floating units – contact us, and we will help you find the right solution.

Why Did Metrum Plates Work on the Workboat?

The challenges of preparing the work deck were specific. It had to:

  • Withstand heavy loads – the equipment used in the construction of the shipping canal consists of heavy machinery operating in dynamic conditions.
  • Be resistant to moisture and changing weather conditions – the deck surface had to remain stable despite exposure to water and wind.
  • Allow for quick assembly and disassembly – a flexible solution that could adapt to changing working conditions.

Thanks to Metrum wooden plates, it was possible to create a safe and stable deck that met all these requirements.

Project Outcomes – Solid Surface on Water

The use of appropriate technologies made it possible to:

  • Create a durable working surface for hydrotechnical equipment.
  • Improve work safety for operators on the deck.
  • Easy assembly and disassembly, adapted to the project’s specifics.

After the completion of the work, the plates were removed, and the unit could return to standard use.

Contact us

Other projects

Rock For People 2025

Kolejny sezon Rock for People za nami. Tym razem 5-dniowy, jeden z największych festiwali w Europie obchodził 30-lecie istnienia. Wystąpiło ponad 200 artystów, m.in. Linkin Park, Slipknot, Guns N’ Roses,

Read More »
Droga dojazdowa do farmy fotowoltaicznej

Access Road in the Lubusz Voivodeship

The construction of a photovoltaic farm in the Lubusz Voivodeship required an access road for transformer transport. Thanks to the rented wooden Metrum plates, the delivery was smooth and safe. Check out the solutions that were applied!

Read More »
×

Lait Content Creator